MWMS System Change Log Project Manager Brain 2026 06 30

System: MWMS
Document Type: Change Log
Authority Level: MCR Source Of Truth
Status: Active
Version: v1.0
Primary Location: MCR
Future Operational Destination: HeadOffice Brain
Parent Page: MWMS System Change Log
Owner: Martyn
Source Of Truth: MCR
Change Date: 2026-06-30

Purpose

This page records the Project Manager Brain operational changes completed on 2026-06-30.

It continues the June 2026 system change record without adding further content to the existing MWMS System Change Log 2026 06 16 To 2026 06 30 page.

Change One

Project Manager Brain Plugin v0.18.0

Added controlled Project creation through the Project Manager Brain Operational Dashboard.

Validated creation of:

Project Manager Brain Multi Brain Operational Build

Confirmed:

Project created through WordPress

direct Supabase entry not required

Project displayed once on the Master Dashboard

Project displayed correctly in the Project Manager Brain read only view

existing Content Brain Project and linked records preserved

no duplicate Project created

Change Two

Project Manager Brain Plugin v0.18.1

Corrected first Current Trusted Save Point creation for new Projects with zero previous Save Points.

Validated:

first Current Trusted Save Point created successfully

no previous Save Point required supersession

exactly one Current Trusted Save Point preserved

existing Save Point behaviour for established Projects preserved

Change Three

Project Manager Brain Plugin v0.18.2

Corrected Task Type Test to Testing to match the existing Supabase project_manager_tasks constraint.

Validated creation of:

Validate Cross Brain Task Visibility

Confirmed:

Task created through WordPress

Task linked to Multi Brain Operational Foundation

Task displayed once in the Project Manager Brain read only view

Master Dashboard totals updated correctly

People Summary updated correctly

existing Content Brain Tasks preserved

no duplicate Task created

Change Four

Project Manager Brain Plugin v0.19.0

Added the Operational Dashboard visibility and navigation foundation.

Added:

top Operational Dashboard Navigation

direct Project navigation controls

collapsed Create New Project section

expandable Project panels

Project summary information

local Jump To controls

clearer Project update visibility

No Supabase table or WordPress page was added.

Change Five

Project Manager Brain Plugin v0.19.1

Corrected Project navigation so selecting a Project:

opens the correct Project panel automatically

moves directly to the opened Project

keeps local Jump To controls visible

does not submit a form

does not change operational data

Removed the ineffective bottom return link.

Validated navigation between:

Project Manager Brain Multi Brain Operational Build

Content Brain Operational Build

Validated the local Create Task jump without creating a Task.

Current Trusted Save Point

Save Point:

Project Manager Brain Operational Dashboard Visibility And Navigation Validated

Active Version:

Project Manager Brain Plugin v0.19.1

Testing State:

Passed

Save Point Status:

Current

Is Current:

Yes

Archived:

No

Registry Update

Project Manager Brain Page Registry updated:

v2.3 To v2.4

Current Approved Position

Two genuine Projects displayed

Two active Workstreams displayed

Three open Tasks displayed

Three Ready Tasks displayed

Zero blocked Tasks displayed

Two Current Trusted Save Points displayed

Controlled Project creation validated

Controlled Workstream creation validated

Controlled Task creation validated

Controlled Save Point creation validated

First Save Point bootstrap validated

Cross Brain Task visibility validated

Operational Dashboard navigation validated

No additional Supabase tables

No additional operational WordPress pages

No automation

No AI coordination

Next Valid Action

Define the controlled scheduling field foundation for Projects, Workstreams and Tasks before introducing calendar views.

Do Not Touch

Do not add:

calendar views

automatic scheduling

automatic Task ordering

automatic Task assignment

dependency automation

workload balancing

notifications

meeting systems

AI coordination

deletion controls

archive controls

ownership editing

relationship editing

Change Impact Declaration

This update records validated Project Manager Brain operational progress only.

It does not change Canon authority.

It does not create a new Supabase table.

It does not create a new operational WordPress page.

It does not authorise automation or AI coordination.

Version: 2.5

Date: 2026-06-30

Author: HeadOffice

Change

Updated the Project Manager Brain Page Registry from v2.4 to v2.5 after the controlled scheduling field foundation was fully validated.

Confirmed Project Manager Brain Plugin v0.20.0 introduced four scheduling fields for Projects, Workstreams and Tasks.

Confirmed the fields are Planned Start Date, Target Completion Date, Actual Start Date and Actual Completion Date.

Confirmed the corresponding Supabase columns were added to project_manager_projects, project_manager_workstreams and project_manager_tasks.

Confirmed no scheduling fields were added to project_manager_save_points.

Confirmed all scheduling columns use date and allow NULL.

Confirmed existing records remained valid with blank dates.

Confirmed invalid planned date order was rejected.

Confirmed valid planned dates were accepted and stored.

Confirmed invalid actual date order was rejected.

Confirmed the v0.20.0 future actual date validation gap was identified.

Confirmed Project Manager Brain Plugin v0.20.1 rejected future Actual Start Date and Actual Completion Date values.

Confirmed Actual Completion Date requires Actual Start Date.

Confirmed valid actual dates were accepted and stored.

Confirmed scheduling values remained stored after refresh.

Confirmed Project Manager Brain Controlled Scheduling Field Foundation Validated became the Current Trusted Save Point.

Confirmed Active Version is Project Manager Brain Plugin v0.20.1.

Confirmed Testing State is Passed.

Confirmed Is Current is Yes.

Confirmed Archived is No.

Confirmed no new Supabase table was created.

Confirmed no new operational WordPress page was created.

Confirmed no calendar view was added.

Confirmed no overdue calculation was added.

Confirmed no automatic scheduling was added.

Confirmed automation and AI coordination remain disabled.

CHANGE IMPACT DECLARATION

This update authorises and records the validated Operational Dashboard visibility and navigation foundation.

The change does not expand the approved write boundary.

The change does not create a new MCR page.

The change does not create a new operational WordPress page.

The change does not create a new Supabase table.

The change does not authorise automatic Save Points.

The change does not authorise Project deletion or archiving.

The change does not authorise ownership editing.

The change does not authorise relationship editing.

The change does not authorise automatic Task assignment.

The change does not authorise automatic Task ordering.

The change does not authorise dependency automation.

The change does not authorise scheduling fields or calendar views.

The change does not authorise automation or AI coordination.

The change preserves MCR as the source of truth and promanbrain.site as the operational surface.

PAGES CREATED

END OF FULL FILE OUTPUT