Document Type: Reference
Status: Active
Authority: HeadOffice
Applies To: All course-derived action items awaiting structural drafting, structural review, or build follow-through
Parent: Governance
Version: v1.1
Last Reviewed: 2026-04-15
Purpose
This reference page provides the active queue used to track course absorption items that have not yet been structurally implemented inside MWMS.
Its purpose is to ensure that valuable course-derived items remain visible between:
• course absorption
• MCR drafting
• structural implementation
• cross-block merging work
• dependency resolution
This queue is the pending-action layer.
It is not the structural registry layer.
It is not the historical memory layer.
Scope
This reference applies to:
• course-derived items approved for follow-up
• items awaiting MCR page creation
• items awaiting update to an existing page
• items awaiting merge with a later block
• items awaiting dependency completion
• items awaiting structural placement clarification
This page governs visibility of pending course absorption actions.
It does not govern:
• final structural record of completed capability
• architecture registry storage
• final canon promotion
• direct implementation logic
• course reading process
Those remain governed by other MWMS standards.
Core Rule
The Handoff Queue stores pending items only.
If an item has already been structurally implemented, it should move out of the queue.
The Architecture Registry becomes the persistent structural record.
The queue must not act as a parallel registry.
Queue Entry Requirement
Each queue entry must include:
• Queue ID
• Course Name
• Block or Section
• Capability Area
• Proposed Action
• Target Brain
• Document Type
• Destination Environment
• Status
• Priority
• Dependency Notes
• Date Added
Status Model
Valid queue statuses include:
• Pending Review
• Ready For MCR Draft
• Ready For Existing Page Update
• Waiting For Related Block
• Waiting For Duplicate Check
• Waiting For Dependency
• Blocked
• Completed
Completed indicates structural implementation has occurred.
Completed items should be removed or archived periodically.
Priority Model
Valid priorities include:
• High
• Medium
• Low
Priority reflects strategic usefulness, not course order.
Entry Movement Rule
Queue items move when structural progress occurs.
Example flow:
course block completes
↓
handoff created
↓
item enters queue
↓
page created or updated
↓
capability implemented
↓
architecture registry updated
↓
item marked Completed
↓
item removed or archived from queue
Queue maintenance must remain minimal.
Queue Purpose Rule
The queue exists to answer:
• what course-derived capabilities are not yet implemented
• what is ready to become structure
• what is waiting on dependencies
• what requires review or merging
• what should move next
It is not a storage page for finished structural work.
Initial Queue Structure
Use the following format for new entries.
QUEUE ENTRY TEMPLATE
Queue ID: CAQ-YYYY-MM-DD-001
Course Name:
Block or Section:
Capability Area:
Proposed Action:
Target Brain:
Document Type:
Destination Environment:
Status:
Priority:
Dependency Notes:
Date Added:
ACTIVE QUEUE
QUEUE ENTRY 1
Queue ID: CAQ-2026-04-15-001
Course Name: CXL Facebook Ads Creative & Experimentation
Block or Section: Creative Testing Structure
Capability Area: Creative Signal Structuring
Proposed Action: Create structured naming standard for creative variables
Target Brain: Ads Brain
Document Type: Framework
Destination Environment: MCR
Status: Completed
Priority: High
Dependency Notes: Supports Creative Testing Structure Framework and Signal Extraction Framework
Date Added: 2026-04-15
QUEUE ENTRY 2
Queue ID: CAQ-2026-04-15-002
Course Name: CXL Facebook Ads Creative & Experimentation
Block or Section: Creative Asset Organization
Capability Area: Creative Asset Knowledge Storage
Proposed Action: Create structured creative asset registry framework
Target Brain: Ads Brain
Document Type: Framework
Destination Environment: MCR
Status: Completed
Priority: High
Dependency Notes: connects with Creative Pattern Library and Testing Matrix
Date Added: 2026-04-15
QUEUE ENTRY 3
Queue ID: CAQ-2026-04-15-003
Course Name: CXL Facebook Ads Creative & Experimentation
Block or Section: Engagement & Lead Signal Layer
Capability Area: Pre Conversion Signal Intelligence
Proposed Action: define framework for extracting signal from non-conversion campaign types
Target Brain: Ads Brain
Document Type: Framework
Destination Environment: MCR
Status: Completed
Priority: Medium
Dependency Notes: connects with Signal Extraction Framework and Behavioural Signal Framework
Date Added: 2026-04-15
QUEUE ENTRY 4
Queue ID: CAQ-2026-04-15-004
Course Name: CXL Facebook Ads Creative & Experimentation
Block or Section: Campaign Structure Design
Capability Area: Signal Integrity Protection
Proposed Action: define structural campaign design principles for interpretable experimentation
Target Brain: Ads Brain
Document Type: Framework
Destination Environment: MCR
Status: Completed
Priority: High
Dependency Notes: supports Paid Media Brain Testing Structure Framework
Date Added: 2026-04-15
QUEUE ENTRY 5
Queue ID: CAQ-2026-04-15-005
Course Name: CXL Facebook Ads Creative & Experimentation
Block or Section: Hypothesis Based Testing
Capability Area: Experimentation Discipline
Proposed Action: define hypothesis structure for paid media testing
Target Brain: Experimentation Brain
Document Type: Framework
Destination Environment: MCR
Status: Completed
Priority: High
Dependency Notes: integrates with Test Lifecycle Model and Evidence Hierarchy
Date Added: 2026-04-15
Governance Role
This page provides operational visibility over the course-to-structure pipeline.
It reduces the chance that valuable course-derived work is forgotten after a strong absorption block.
The queue exists only to support structural progress.
Structural truth is stored in:
MWMS Architecture Registry
Relationship to Other MWMS Standards
This page works alongside:
MWMS Course Absorption Workflow
MWMS Course Absorption Handoff Standard
MWMS Course Absorption Decision Registry
MWMS Architecture Registry
AI Output Standard Full File Delivery Rule
Drift Protection
The system must prevent:
• pending course actions being lost in threads
• finished work remaining in queue indefinitely
• queue items being treated as structural registry
• queue items being treated as historical memory
• duplicate tracking occurring across multiple surfaces
• unnecessary queue maintenance after implementation
Queue must remain lightweight and forward-moving.
Architectural Intent
MWMS Course Absorption Handoff Queue exists to hold the live action pipeline between learning and structural implementation.
Its role is to provide one visible staging surface for course-derived items that are not yet structurally complete.
It is a temporary coordination layer.
It is not the system memory layer.
Change Log
Version: v1.1
Date: 2026-04-15
Author: HeadOffice
Change:
Clarified queue role as temporary staging layer only.
Removed implicit requirement for ongoing queue maintenance after structural implementation.
Aligned queue behaviour with MWMS Course Absorption Workflow.
Change Impact Declaration
Pages Created:
None
Pages Updated:
MWMS Course Absorption Handoff Queue
Pages Deprecated:
None
Registries Requiring Update:
None
Canon Version Update Required:
No
Change Log Entry Required:
Yes