Parent Page: Project Manager Brain
Version: 1.8
Date: 2026-06-26
Author: HeadOffice
Status: Active
Page Type: Brain Page Registry
Authority Level: MWMS Registry
Purpose
Project Manager Brain Page Registry records the approved MCR pages, operational website pages, current versions, page purposes, parent relationships, authority roles and build status for Project Manager Brain.
This Registry exists to prevent:
duplicate pages
unclear parent relationships
operational pages being mistaken for Canon
Canon pages being copied unnecessarily into the operational website
page drift
naming inconsistency
unsupported page creation
version uncertainty
registry gaps
conflicting Project Manager Brain structures
This Registry must remain aligned with:
Project Manager Brain
Project Manager Brain Canon
Project Manager Brain Architecture
Project Manager Brain Operating Model
Project Manager Brain Workflow Map
promanbrain.site
MWMS Page Parent Map
MWMS Document Registry
MWMS Brain Registry
MWMS Architecture Registry
MWMS Brain Interaction Map
Registry Scope
This Registry covers two separate page layers.
MCR Source Of Truth Layer
This layer contains the approved Project Manager Brain definition, Canon, architecture, operating model, workflow and registry pages.
Operational Website Layer
This layer contains the live Project Manager Brain interface pages on promanbrain.site.
These layers must not be merged.
MCR defines the Brain.
promanbrain.site operates the Brain.
Source Of Truth Rule
MCR is the source of truth for:
Project Manager Brain definition
Project Manager Brain Canon
Project Manager Brain Architecture
Project Manager Brain Operating Model
Project Manager Brain Workflow Map
Project Manager Brain Page Registry
future approved standards
future approved specifications
future approved templates
future approved protocols
promanbrain.site is the operational surface for:
projects
workstreams
tasks
priorities
dependencies
blockers
changes
decisions
meetings
actions
testing
acceptance
versions
reports
settings
Operational records must not redefine MCR authority.
Registry Status Definitions
Active
The page is approved and currently in use.
Planned
The page has been approved for future creation but does not yet exist.
Deferred
The page may be useful later but is not approved for current creation.
Not Required
The page has been considered and is not currently needed.
Duplicate
The page duplicates an existing approved page and must not be created.
Deprecated
The page is no longer active and should not be used as current authority.
Operational
The page is a working interface and is not Canon.
MCR Page Registry
Project Manager Brain
Parent Page: Brains
Version: 1.0
Status: Active
Page Type: Brain Definition
Authority Role: Defines the purpose, mission, scope, responsibilities, boundaries, coordination role and first operational direction of Project Manager Brain.
Operational Copy Required: No
Notes:
This is the primary MCR parent page for Project Manager Brain.
It establishes Project Manager Brain as the MWMS execution coordination and project control Brain.
Project Manager Brain Canon
Parent Page: Project Manager Brain
Version: 1.0
Status: Active
Page Type: Brain Canon
Authority Role: Defines permanent authority boundaries, non-negotiable rules, execution controls, priority rules, testing rules, evidence requirements, version alignment requirements, change controls and human review requirements.
Operational Copy Required: No
Notes:
This page governs all Project Manager Brain operational systems, plugins, databases, AI support and future AIBS extensions.
Project Manager Brain Architecture
Parent Page: Project Manager Brain
Version: 1.0
Status: Active
Page Type: Brain Architecture
Authority Role: Defines the structural design, system layers, record types, operational surfaces, data architecture, integration architecture, permissions, audit requirements and phased implementation path.
Operational Copy Required: No
Notes:
This page establishes WordPress as the interface layer, a controlled plugin as the application layer, Supabase as the intended structured data layer and MCR as the source of truth.
Project Manager Brain Operating Model
Parent Page: Project Manager Brain
Version: 1.0
Status: Active
Page Type: Brain Operating Model
Authority Role: Defines how Project Manager Brain operates day to day across project intake, task control, priority management, daily planning, weekly review, dependencies, blockers, meetings, testing, save points, versions and escalation.
Operational Copy Required: No
Notes:
This page defines practical operating behaviour and human review requirements.
Project Manager Brain Workflow Map
Parent Page: Project Manager Brain
Version: 1.0
Status: Active
Page Type: Brain Workflow Map
Authority Role: Defines the complete execution flow from approved direction through project intake, planning, execution, testing, acceptance, save-point control, version alignment, reporting and closure.
Operational Copy Required: No
Notes:
This page contains the complete initial workflow.
Separate workflow pages are not required at this stage.
Project Manager Brain Page Registry
Parent Page: Project Manager Brain
Version: 1.8
Status: Active
Page Type: Brain Page Registry
Authority Role: Records approved MCR and operational pages, versions, parent relationships, authority roles and page creation controls.
Operational Copy Required: No
Notes:
This Registry must be updated whenever a Project Manager Brain MCR page or operational page is created, renamed, moved, deprecated or replaced.
Approved MCR Parent Structure
Brains
To
Project Manager Brain
To
Project Manager Brain Canon
Project Manager Brain Architecture
Project Manager Brain Operating Model
Project Manager Brain Workflow Map
Project Manager Brain Page Registry
Operational Website Registry
Operational Domain
promanbrain.site
Operational Parent Page
Project Manager Brain
Status: Operational
Authority Role: Provides the top-level operational entry point for Project Manager Brain.
Canonical Authority: None
Source Of Truth: MCR Project Manager Brain pages
Project Manager Brain Dashboard
Parent Page: Project Manager Brain
Status: Operational
Page Purpose:
Provide the current execution overview across:
active projects
current main focus
today’s priorities
blockers
testing
decisions required
recent changes
version warnings
next valid actions
near-future work
Canonical Authority: None
Project Manager Brain Projects
Parent Page: Project Manager Brain
Status: Operational
Page Purpose:
Create, view, update, archive and review project records.
Canonical Authority: None
Project Manager Brain Workstreams
Parent Page: Project Manager Brain
Status: Operational
Page Purpose:
Create, organise and monitor project workstreams.
Canonical Authority: None
Project Manager Brain Tasks
Parent Page: Project Manager Brain
Status: Operational
Page Purpose:
Create, assign, update, test, accept, close and archive tasks.
Canonical Authority: None
Project Manager Brain Priorities
Parent Page: Project Manager Brain
Status: Operational
Page Purpose:
Show approved execution order, priority categories, readiness and priority reasoning.
Canonical Authority: None
Project Manager Brain Dependencies
Parent Page: Project Manager Brain
Status: Operational
Page Purpose:
Show dependencies, waiting work, required inputs, dependency owners, affected work and work unlocked when dependencies are satisfied.
Canonical Authority: None
Project Manager Brain Changes And Decisions
Parent Page: Project Manager Brain
Status: Operational
Page Purpose:
Record approved decisions, approved changes, impact reviews, affected projects, affected tasks, testing impact and version impact.
Canonical Authority: None
Project Manager Brain Meetings And Actions
Parent Page: Project Manager Brain
Status: Operational
Page Purpose:
Capture meeting notes, review extracted actions and decisions and apply approved updates to live project records.
Canonical Authority: None
Project Manager Brain Testing And Acceptance
Parent Page: Project Manager Brain
Status: Operational
Page Purpose:
Manage test records, failed tests, corrective work, retesting, evidence, acceptance and completion integrity.
Canonical Authority: None
Project Manager Brain Version Alignment
Parent Page: Project Manager Brain
Status: Operational
Page Purpose:
Track Canon versions, operational versions, plugin versions, schema versions, save points, compatibility states and retesting requirements.
Canonical Authority: None
Project Manager Brain Reports
Parent Page: Project Manager Brain
Status: Operational
Page Purpose:
Generate action-driven daily, weekly, project, blocker, dependency, testing, version, escalation and future-readiness reports.
Canonical Authority: None
Project Manager Brain Settings
Parent Page: Project Manager Brain
Status: Operational
Page Purpose:
Control approved statuses, permissions, system values, connections and future integration settings.
Canonical Authority: None
Approved Operational Parent Structure
Project Manager Brain
To
Project Manager Brain Dashboard
Project Manager Brain Projects
Project Manager Brain Workstreams
Project Manager Brain Tasks
Project Manager Brain Priorities
Project Manager Brain Dependencies
Project Manager Brain Changes And Decisions
Project Manager Brain Meetings And Actions
Project Manager Brain Testing And Acceptance
Project Manager Brain Version Alignment
Project Manager Brain Reports
Project Manager Brain Settings
Current Operational Page Count
Parent Pages: 1
Child Pages: 12
Total Approved Operational Pages: 13
Duplicate Operational Pages: 0
Unapproved Operational Pages: 0
Current MCR Page Count
Parent Pages: 1
Child Pages: 5
Total Approved MCR Pages: 6
Duplicate MCR Pages: 0
Unapproved MCR Pages: 0
Page Naming Control
All Project Manager Brain pages must:
use Title Case
use Project Manager Brain as the visible Brain name
avoid unnecessary punctuation
avoid duplicate purpose
avoid abbreviations in page titles
follow MWMS Page Naming Standard
use a clear operational or Canon role
remain under the correct parent
be recorded in this Registry
Approved Operational Slugs
Project Manager Brain
Slug:
project-manager-brain
Project Manager Brain Dashboard
Slug:
project-manager-brain-dashboard
Project Manager Brain Projects
Slug:
project-manager-brain-projects
Project Manager Brain Workstreams
Slug:
project-manager-brain-workstreams
Project Manager Brain Tasks
Slug:
project-manager-brain-tasks
Project Manager Brain Priorities
Slug:
project-manager-brain-priorities
Project Manager Brain Dependencies
Slug:
project-manager-brain-dependencies
Project Manager Brain Changes And Decisions
Slug:
project-manager-brain-changes-and-decisions
Project Manager Brain Meetings And Actions
Slug:
project-manager-brain-meetings-and-actions
Project Manager Brain Testing And Acceptance
Slug:
project-manager-brain-testing-and-acceptance
Project Manager Brain Version Alignment
Slug:
project-manager-brain-version-alignment
Project Manager Brain Reports
Slug:
project-manager-brain-reports
Project Manager Brain Settings
Slug:
project-manager-brain-settings
Pages Not Approved For Creation
The following standalone pages are not approved at this stage:
Project Manager Brain Daily Review Protocol
Project Manager Brain Weekly Review Protocol
Project Manager Brain Project Intake Standard
Project Manager Brain Save Point Standard
Project Manager Brain Priority Scoring Framework
Project Manager Brain Dependency Framework
Project Manager Brain Blocker Framework
Project Manager Brain Meeting Action Workflow
Project Manager Brain Testing Workflow
Project Manager Brain Acceptance Framework
Project Manager Brain Version Alignment Workflow
Project Manager Brain Escalation Framework
Project Manager Brain Dashboard Specification
Project Manager Brain Database Schema Specification
Project Manager Brain Plugin Build Specification
Project Manager Brain Permissions Framework
Project Manager Brain Reporting Framework
Project Manager Brain Employee Registry
These items may be introduced only when:
the operational build demonstrates a clear need
the current core pages cannot safely hold the requirement
the page would reduce confusion or implementation risk
the page is approved
the Page Registry is updated
the correct parent is confirmed
Pages Deliberately Combined
The following areas remain combined within existing pages.
Project Manager Brain Priority Logic
Current Location:
Project Manager Brain Canon
Project Manager Brain Architecture
Project Manager Brain Operating Model
Project Manager Brain Workflow Map
Reason:
A separate priority framework is not required before the first operational validation.
Project Manager Brain Dependency Logic
Current Location:
Project Manager Brain Canon
Project Manager Brain Architecture
Project Manager Brain Operating Model
Project Manager Brain Workflow Map
Reason:
A separate dependency framework would create unnecessary early page growth.
Project Manager Brain Meeting Logic
Current Location:
Project Manager Brain Canon
Project Manager Brain Architecture
Project Manager Brain Operating Model
Project Manager Brain Workflow Map
Reason:
The current foundation pages contain enough control for the initial manual build.
Project Manager Brain Testing And Acceptance Logic
Current Location:
Project Manager Brain Canon
Project Manager Brain Architecture
Project Manager Brain Operating Model
Project Manager Brain Workflow Map
Reason:
A separate framework is not required until detailed implementation or testing complexity demands one.
Project Manager Brain Version Alignment Logic
Current Location:
Project Manager Brain Canon
Project Manager Brain Architecture
Project Manager Brain Operating Model
Project Manager Brain Workflow Map
Reason:
The initial version-alignment requirement is sufficiently defined for early implementation.
Future Page Decision Rule
A future Project Manager Brain page may be created only when at least one of the following applies:
the page defines a distinct authority
the page defines a distinct system structure
the page is required for implementation
the page is required for testing
the page is required for safe handoff
the page is required to prevent drift
the page is required to preserve source truth
the page is required because the existing page has become too broad to operate safely
A page must not be created merely because:
the topic exists
the topic appears important
another Brain has a similar page
the page title sounds useful
the content could be separated
the system may need it eventually
Operational Page Control
Operational pages may not be added without:
clear page purpose
confirmation that no existing page can hold the function
confirmation that the page is operational rather than Canon
approved title
approved parent
approved slug
Page Registry update
impact review
navigation review
Operational pages should remain restrained.
The operational website should not become a documentation library.
MCR Copy Rule
MCR pages must not be copied in full onto promanbrain.site unless a specific operational copy is approved.
Operational pages should display:
live records
forms
tables
filters
dashboards
task views
project views
reports
settings
They should reference MCR where required.
They should not reproduce Canon unnecessarily.
Registry Update Triggers
This Registry must be reviewed when:
a new MCR page is created
a new operational page is created
a page is renamed
a page slug changes
a page parent changes
a page is deprecated
a page is replaced
a page is merged
a page is moved
a page becomes an operational copy
a Canon version changes
an implementation specification is introduced
an operational page is removed
a duplicate is identified
Registry Change Requirements
Every Registry update must state:
page affected
previous state
new state
reason
parent impact
version impact
operational impact
Canon impact
navigation impact
related registry updates
Initial Build Position
The Project Manager Brain MCR foundation is now established.
Completed MCR foundation pages:
Project Manager Brain
Project Manager Brain Canon
Project Manager Brain Architecture
Project Manager Brain Operating Model
Project Manager Brain Workflow Map
Project Manager Brain Page Registry
Completed operational website pages:
Project Manager Brain
Project Manager Brain Dashboard
Project Manager Brain Projects
Project Manager Brain Workstreams
Project Manager Brain Tasks
Project Manager Brain Priorities
Project Manager Brain Dependencies
Project Manager Brain Changes And Decisions
Project Manager Brain Meetings And Actions
Project Manager Brain Testing And Acceptance
Project Manager Brain Version Alignment
Project Manager Brain Reports
Project Manager Brain Settings
Current Build State
MCR Foundation: Completed
Operational Page Shell: Completed
Operational Dashboard: Active
Project Manager Brain Plugin: v0.13.2 Active
Supabase Build: Four Core Tables Created And Validated
Project Records: One Active Project Created And Displayed
Workstream Records: One Active Linked Workstream Created And Displayed
Task Records: One In Progress Linked Task Created And Displayed
Save Point Records: Current And Historical Save Points Preserved
Complete Project State Reconstruction: Confirmed
Controlled Project Status Write: Confirmed
Controlled Project Priority Write: Confirmed
Controlled Project Priority Reason Write: Confirmed
Controlled Project Current Phase Write: Confirmed
Controlled Project Current Version Write: Confirmed
Controlled Project Testing State Write: Confirmed
Controlled Project Blocker State Write: Confirmed
Controlled Project Blocker Summary Write: Confirmed
Controlled Project Risk State Write: Confirmed
Controlled Project Next Valid Action Write: Confirmed
Controlled Workstream Status Write: Confirmed
Controlled Workstream Priority Write: Confirmed
Controlled Workstream Priority Reason Write: Confirmed
Controlled Workstream Readiness Write: Confirmed
Controlled Workstream Testing State Write: Confirmed
Controlled Workstream Blocker State Write: Confirmed
Controlled Workstream Blocker Summary Write: Confirmed
Controlled Workstream Next Valid Action Write: Confirmed
Controlled Task Status Write: Confirmed
Controlled Task Priority Write: Confirmed
Controlled Task Priority Reason Write: Confirmed
Controlled Task Readiness Write: Confirmed
Controlled Task Blocker State Write: Confirmed
Controlled Task Blocker Summary Write: Confirmed
Controlled Task Next Valid Action Write: Confirmed
Project Explanation Form Correction: Confirmed In v0.13.1
Workstream And Task Explanation Form Corrections: Confirmed In v0.13.2
Workstream Current Phase Capability: Not Present
Workstream Current Version Capability: Not Present
Task Current Phase Capability: Not Present
Task Current Version Capability: Not Present
Workstream Risk State Capability: Not Present
Task Risk State Capability: Not Present
Task Testing State Capability: Not Present
Task Ready Blocker Rule: Confirmed
Visual Hierarchy Refinement: Confirmed
Priority Logic Implementation: Controlled Write Confirmed
Priority Explanation Logic Implementation: Controlled Project, Workstream And Task Write Confirmed
Readiness Logic Implementation: Controlled Workstream And Task Write Confirmed
Testing State Logic Implementation: Controlled Project And Workstream Write Confirmed
Blocker State Logic Implementation: Controlled Project, Workstream And Task Write Confirmed
Blocker Explanation Logic Implementation: Controlled Project, Workstream And Task Write Confirmed
Risk State Logic Implementation: Controlled Project Write Confirmed
Project Phase And Version Logic Implementation: Controlled Project Write Confirmed
Dependency Logic Implementation: Not Started
Meeting Action Implementation: Not Started
Testing And Acceptance Implementation: Not Started
Version Alignment Implementation: Current Save Point Display Confirmed
Reporting Implementation: Not Started
Content Brain Operational Build Project: Active
Automation: Not Started
AI Recommendation Layer: Not Started
Additional Supabase Tables: None
Additional WordPress Pages: None
Current Controlled Write Boundary
Approved Project write access is limited to:
Project Status
Project Priority
Project Priority Reason
Project Current Phase
Project Current Version
Project Testing State
Project Blocker State
Project Blocker Summary
Project Risk State
Project Next Valid Action
Approved Workstream write access is limited to:
Workstream Status
Workstream Priority
Workstream Priority Reason
Workstream Readiness
Workstream Testing State
Workstream Blocker State
Workstream Blocker Summary
Workstream Next Valid Action
Approved Task write access is limited to:
Task Status
Task Priority
Task Priority Reason
Task Readiness
Task Blocker State
Task Blocker Summary
Task Next Valid Action
Task Readiness Ready only permits Task Blocker State:
None
Resolved
Accepted Risk
The following remain unavailable:
Workstream Current Phase editing
Workstream Current Version editing
Task Current Phase editing
Task Current Version editing
Workstream Risk State editing
Task Risk State editing
Task Testing State editing
project creation through WordPress
project deletion
project archiving
project ownership changes
workstream creation through WordPress
workstream deletion
workstream archiving
task creation through WordPress
task deletion
task archiving
structural relationship changes
automatic save points
automatic task assignment
automation
AI coordination
Current Save Point
Project Manager Brain Controlled Operational Explanation Write Validated
Project Manager Brain Plugin v0.13.2 Active
Supabase Connection Confirmed
One Project Displayed
One Linked Workstream Displayed
One Linked Task Displayed
One Current Trusted Save Point Displayed
Project Status Write Confirmed
Project Priority Write Confirmed
Project Priority Reason Write Confirmed
Project Current Phase Write Confirmed
Project Current Version Write Confirmed
Project Testing State Write Confirmed
Project Blocker State Write Confirmed
Project Blocker Summary Write Confirmed
Project Risk State Write Confirmed
Project Next Valid Action Write Confirmed
Workstream Status Write Confirmed
Workstream Priority Write Confirmed
Workstream Priority Reason Write Confirmed
Workstream Readiness Write Confirmed
Workstream Testing State Write Confirmed
Workstream Blocker State Write Confirmed
Workstream Blocker Summary Write Confirmed
Workstream Next Valid Action Write Confirmed
Task Status Write Confirmed
Task Priority Write Confirmed
Task Priority Reason Write Confirmed
Task Readiness Write Confirmed
Task Blocker State Write Confirmed
Task Blocker Summary Write Confirmed
Task Next Valid Action Write Confirmed
Project Status: Active
Project Priority: High
Project Priority Reason: Stored
Project Current Phase: Operational Build
Project Current Version: Content Brain Production Plugin v0.6.7
Project Testing State: Not Started
Project Blocker State: None
Project Blocker Summary: Stored
Project Risk State: None
Workstream Status: Active
Workstream Priority: High
Workstream Priority Reason: Stored
Workstream Readiness: Ready
Workstream Testing State: Not Started
Workstream Blocker State: None
Workstream Blocker Summary: Stored
Task Status: In Progress
Task Priority: High
Task Priority Reason: Stored
Task Readiness: Ready
Task Blocker State: None
Task Blocker Summary: Stored
Project Explanation Form Correction Confirmed
Workstream Explanation Form Correction Confirmed
Task Explanation Form Correction Confirmed
Complete Project State Reconstruction From Supabase Confirmed
Visual Hierarchy Refinement Confirmed
Previous v0.12.0 Save Point Superseded
Historical Save Points Preserved
Testing State: Passed
Blocked Work: None
No Project Creation
No Workstream Creation
No Task Creation
No Delete Controls
No Archive Controls
No Ownership Editing
No Relationship Editing
No Workstream Current Phase Editing
No Workstream Current Version Editing
No Task Current Phase Editing
No Task Current Version Editing
No Workstream Risk State Editing
No Task Risk State Editing
No Task Testing State Editing
No Additional Tables
No Additional WordPress Pages
No Automation
No AI Coordination
Human Controlled Build Maintained
Next Valid Action
Continue using Project Manager Brain with real operational work and keep Priority Reason and Blocker Summary aligned with the actual operational position.
The next capability decision must be based on operational need rather than testing convenience.
No further write capability is approved at this save point.
No additional MCR pages, operational WordPress pages or Supabase tables should be created for this decision.
Registry Success Criteria
This Registry is functioning correctly when:
every approved page is listed
every page has the correct parent
every page has a clear purpose
every active MCR page has a version
operational pages are clearly separated from Canon
duplicate pages are prevented
unapproved pages are prevented
slugs remain consistent
future page proposals are controlled
the current build state is visible
the next valid action is clear
Registry Failure Conditions
This Registry is failing when:
pages exist without being recorded
duplicate pages are created
operational pages are treated as Canon
MCR content is copied unnecessarily
page parents are incorrect
page names drift
page slugs become inconsistent
page purposes overlap
unnecessary standalone pages are created
deprecated pages remain active
versions are missing
the current build state is inaccurate
the Registry falls behind operational reality
MWMS System Change Log
Version: 1.8
Date: 2026-06-26
Author: HeadOffice
Change
Updated the Project Manager Brain Page Registry from v1.7 to v1.8 after Project Manager Brain Plugin v0.13.2 controlled operational explanation writes were fully validated.
Confirmed that priority_reason and blocker_summary exist for Projects, Workstreams and Tasks.
Confirmed all six fields are nullable text fields with no database constraints.
Recorded the v0.13.1 Project explanation form correction.
Recorded the v0.13.2 Workstream and Task explanation form corrections.
Confirmed successful controlled writes for:
Project Priority Reason
Project Blocker Summary
Workstream Priority Reason
Workstream Blocker Summary
Task Priority Reason
Task Blocker Summary
Confirmed that all six values remained stored after refresh.
Confirmed that existing controlled Status, Priority, Readiness, Testing State, Blocker State, Risk State, Current Phase, Current Version and Next Valid Action writes remained operational.
Recorded the current operational position:
Project Manager Brain Plugin v0.13.2 Active
complete project-state reconstruction from Supabase confirmed
controlled Project Priority Reason write validated
controlled Project Blocker Summary write validated
controlled Workstream Priority Reason write validated
controlled Workstream Blocker Summary write validated
controlled Task Priority Reason write validated
controlled Task Blocker Summary write validated
Project explanation form correction validated
Workstream explanation form correction validated
Task explanation form correction validated
four-table foundation preserved
one Project displayed
one linked Workstream displayed
one linked Task displayed
one current trusted Save Point displayed
previous v0.12.0 Save Point superseded
historical Save Points preserved
blocked work recorded as None
no additional tables
no additional WordPress pages
no project, Workstream or Task creation through WordPress
no delete controls
no archive controls
no ownership editing
no relationship editing
no automation
no AI coordination
Change Impact Declaration
This update aligns the Project Manager Brain Page Registry with the validated v0.13.2 operational state.
The change records existing validated capability only.
The change does not add or authorise any further operational write capability.
The change does not create a new MCR page.
The change does not create a new operational WordPress page.
The change does not create a new Supabase table.
The change preserves MCR as the source of truth and promanbrain.site as the operational surface.
Pages Created
None
Pages Updated
Project Manager Brain Page Registry
Previous Version:
v1.7
New Version:
v1.8
Reason:
The Registry required alignment with the validated Project Manager Brain Plugin v0.13.2 controlled Priority Reason and Blocker Summary write layer and current trusted Save Point.
Parent Impact
None
The Project Manager Brain Page Registry remains under Project Manager Brain.
Operational Impact
The Registry now accurately records controlled operational explanation writes across Project, Workstream and Task records.
Canon Impact
None
Project Manager Brain Canon remains at v1.0.
Navigation Impact
None
No page titles, slugs, parents or navigation positions changed.
Pages Deprecated
None
Registries Requiring Update
None for page structure.
The MWMS System Change Log 2026 06 16 To 2026 06 30 requires a separate v0.13.2 operational progression entry.
Canon Version Update Required
No
Project Manager Brain Canon remains at v1.0.
Change Log Entry Required
Yes
Record the Project Manager Brain v0.13.2 controlled operational explanation write validation in MWMS System Change Log 2026 06 16 To 2026 06 30.
Strategic Absorption Result
Project Manager Brain now supports validated controlled Priority Reason and Blocker Summary writes across Projects, Workstreams and Tasks.
The current system continues to reconstruct one complete Project, linked Workstream, linked Task and current trusted Save Point from Supabase.
The four-table foundation, historical Save Points and human-controlled safety boundary remain preserved.
Further write expansion remains paused until real operational use demonstrates a clear need.
END OF FULL FILE OUTPUT